01. 05-04-2013

Procurement of PCC Poles (PACKAGE—A2) for implementation of R-APDRP (Part-B) Scheme under Agartala Project Area (Phase-II).

AGM(DP&C)/R-APDRP/Pt-B/AGT-II/2012-13/02 (PACKAGE –A2)

BID DOCUMENT                 CORRIGENDUM

02. 04-06-2013

8mtr. long Steel Tubular Pole.
Quantity = 1000 nos
N.I.T. No:-ESD/ 14 /2013-14

BID-DOCUMENT

03. 05-06-2013

9mtr. long Steel Tubular Pole.
Quantity = 2000 nos.
N.I.T. No:-ESD/ 06 /2013-14

BID-DOCUMENT

04. 07-06-2013

M.S. heavy coating galvanized 8 S.W.G. (4.06mm) iron wire .
Quantity= 100 MT
N.I.T. No:- ESD/13/2013-14

BID-DOCUMENT

05. 11-06-2013

Procurement of Painted Stay Set for H.T./L.T.Line.
Quantity = 10,000 set.
N.I.T.No:ESD/04/2013-14

BID-DOCUMENT

06. 04-06-2013

Providing 11KV dedicated power connection to upcoming Central Prison, Bishalgarh by laying of 3.9 KM 185 sq mm XLPE 11 KV UG cable including construction of 0.5 KM 11 KV overhead line

BID-DOCUMENT

07. 12-06-2013

Construction of 11 KV line from Lungfung trijunction (1.5 KM ) and LT line (2 KM) with 2X 63 KVA Sub-Station at Tampui under Killa Verma ADC Village of Jampuijala RD Block with in the jurisdiction of Electrical Sub-Division, Jampuijala.

(N.I.T. no.- D.G.M./ED-VIII/2013-14/02 Dated, 24/05/2013)

08. 18-06-2013

Procurement of ACSR Conductor for implementation of R-APDRP (Part-B) Scheme under Khowai, Teliamura, Ranirbazar & Gandhigram Project Areas.

AGM(DP&C)/R-APDRP/Pt-B/EC-IV/2013-14/30    Date : 29-05-2013

BID-DOCUMENT

CORRIGENDUM

09. 15-06-2013

Procurement of Steel Tubular Poles for implementation of R-APDRP (Part-B) Scheme under Khowai, Teliamura, Ranirbazar & Gandhigram Project Areas.

AGM(DP&C)/R-APDRP/Pt-B/EC-IV/ 2013-14/31    Date : 29-05-2013

BID-DOCUMENT

10. 15-06-2013

Procurement of PCC Poles for implementation of R-APDRP (Part-B) Scheme under Khowai, Teliamura, Ranirbazar & Gandhigram Project Areas.

AGM(DP&C)/R-APDRP/Pt-B/EC-IV/ 2013-14/32    Date : 29-05-2013

BID-DOCUMENT

11. 19-06-2013

Procurement of Distribution Transformer for implementation of R-APDRP (Part-B) Scheme under Khowai, Teliamura, Ranirbazar & Gandhigram Project Areas.

AGM(DP&C)/R-APDRP/Pt-B/EC-IV/ 2013-14/34    Date : 29-05-2013

BID-DOCUMENT

12. 20-06-2013

Procurement of Power Cables for implementation of R-APDRP (Part-B) Scheme under Khowai, Teliamura, Ranirbazar & Gandhigram Project Areas.

AGM(DP&C)/R-APDRP/Pt-B/EC-IV/ 2013-14/35    Date : 29-05-2013

BID-DOCUMENT

CORRIGENDUM

13. 22-06-2013

Procurement of G.I. Straps & Bolts. Qty = 30,000 pair.        

N.I.T. No:- ESD/11/2013-14

BID-DOCUMENT

MEMORANDUM

14. 25-06-2013

Procurement of Spare Parts of 12KV, 200 Amps., manual gang operated Air Break Switch, 3 post vertical type .

a.     Fixed contact assembly=2500 Set                                                       b.     Back terminal pad=1500 Set.                                                              c.     Support for braided flexible tape=2000 Set.                                     d.     Braided flexible tape = 2000nos.                                                        e.     Moving contact assembly=2500 Set                                                  f.      Post insulator=1500 Nos.

N.I.T. No:- ESD/03/2013-14

BID-DOCUMENT

15. 26-06-2013

Procurement of AC, LT CT Operated TOU (TOD), 3-Ph.-4-Wire static LCD energy meter (200/5A) i/c Poly carbonate Meter Box.   Quantity =500 nos.

N.I.T. No:- ESD/08/2013-14

BID-DOCUMENT

PRE-BID DISCUSSION

CORRIGENDUM

MEMORANDUM

16. 27-06-2013

Procurement of AC, LT CT Operated TOU (TOD), 3-Ph.-4-Wire static LCD energy meter (100/5A) i/c Poly carbonate Meter Box.                                                                                         Quantity =1000 nos.

N.I.T. No:- ESD/07/2013-14

BID-DOCUMENT

PRE-BID DISCUSSION

CORRIGENDUM

MEMORANDUM

17. 18-06-2013

Procurement of Bi-metallic Lugs for terminal connection of conductors of different sizes.

N.I.T. No:-ESD/02/2013-14

BID-DOCUMENT

18. 20-06-2013

Procurement of Single circuit rewirable, extended type porcelain Kit Kat Fuse Units of different sizes.

N.I.T.No:- ESD/12/2013-14

BID-DOCUMENT

19.

26 -06-2013

Procurement of Fr-5 & Fr.-3 GT Auxiliary Spare    Parts (Mech). at Gas    Thermal Power Station,    Rokhia.

DNIT NO. 01 Date:-30-05-13

BID-DOCUMENT

20.

26-06-2013

Refilling & Supply of CO2 Cylinder at Gas Thermal Power Station, Rokhia.

DNIT NO.02 Date:-30-05-13

BID-DOCUMENT

21. 21-06-2013

Conversion i/c Repairing of 11/132 KV to 132/11 KV and 6.6/66 KV to 66/11 KV Power Transformer at different sub-station of TSECL.

E.O.I:- DGM/T&C/13-14/01  dt.17.05.13

DRAFT  NOTICE INVITING EXPRESSION OF INTEREST

22. 12-07-2013

Supply, Erection, Testing and Commissioning of 11KV VCBs at Bodhjungnhar 132KV Sub-Station , West Tripura District.

D.NIT No: AGM/TC/ 13-14/ 01 Date. 24/05/2013

23. 09-07-2013

Providing 1(one) No. Maruti Van (OMNI) for use in the Office of the Addl.General Manager, Electrical Circle No-V, Tripura State Electricity Corporation Limited, Ambassa, Dhalai, Tripura

24. 01-07-2013 Major repairing of 11/0˙433KV distribution transformer of capacity 25 KVA (200 Nos), 63 KVA (50 nos), 100 KVA (30 nos) complete with replacement of damaged components for the year 2013-14.
25. 01-07-2013 Conversion i/c Repairing of 11/132 KV to 132/11 KV and 6.6/66 KV to 66/11 KV Power Transformer at different sub-station of TSECL.
26. 01-07-2013

12KV, 200A, 2 Post Rocking Type, manual Gang Operated Air Break Switch.

BID-DOCUMENT

27. 25-07-2013

Augmentation of P.K. Bari Sub-Station, with 132KV Bay for Termination of 400KV Line.

DNIT No: AGM/TC/ 13-14/ 03 Dates. 12/06/2013

28. 19-07-2013

Procurement of Single Insulator Tension Fittings for 11 KV Disc Insulator as per specification conforming to IS: 2486(P-I)/1972 & 2486/(P-II)/and(P-III) /1974 or as per latest amendment, FOT at Electrical Stores Division. Qty = 10,000 set.

N.I.T. No:- ESD/15/2013-14

BID-DOCUMENT

29. 10-07-2013 Procurement of GOS, DOF, LA, Hardware Fittings, GI stranded wire & 8 SWG GI Wire for implementation of R-APDRP (Part-B) Scheme under Khowai, Teliamura, Ranirbazar & Gandhigram Project Areas.

AGM(DP&C)/R-APDRP/ Pt-B/EC-IV/2013-14/33 Date: 25-06-2013

BID-DOCUMENT

30. 25-07-2013

Procurement of 11 KV Brown glazed Porcelain Disc Insulator, Ball & Socket type, for 11KV system (E. M. S.-45KN). Qty = 25,000 nos.

N.I.T. No:- ESD/16/2013-14

BID-DOCUMENT              MEMORANDUM

31. 23-07-2013

Procurement of PCC Poles (PACKAGE—A2) for implementation of R-APDRP (Part-B) Scheme under Agartala Project Area (Phase-II).

AGM(DP&C)/R-APDRP/Pt-B / AGT-II/2013-14 / 02 (Package–A2). Date : 15-03-2013

BID-DOCUMENT

2nd Call

32. 23-07-2013

Procurement of PCC Poles for implementation of R-APDRP (Part-B) Scheme under Badharghat, Pratapgarh Jogendranagar, Indranagar,  Sonamura Project area.

AGM(DP&C)/R-APDRP/Pt-B/EC-II / 2013-14/25 ,  Date : 16-04-2013

BID-DOCUMENT

33. 23-07-2013

Procurement of PCC Poles for implementation of R-APDRP (Part-B) Scheme under Udaipur,Amarpur & Belonia  Project area.

AGM(DP&C)/R-APDRP/Pt-B/EC-I / 2013-14/ 17, Date 26-03-2013

BID-DOCUMENT

34. 05-08-2013

Procurement of Power Cables for implementation of R-APDRP (Part-B) Scheme under Udaipur, Belonia & Amarpur Project Area.

AGM(DP&C)/R-APDRP/Part-B/EC-I/2012-13/22,           Dated: 26-03-2013

BID-DOCUMENT

AMENDMENT                                      CORRIGENDUM   

2nd Call

35. 05-08-2013

Procurement of Power Cables for implementation of R-APDRP (Part-B) Scheme under Khowai, Teliamura, Ranirbazar & Gandhigram Project Area.

AGM(DP&C)/R-APDRP/Part-B/EC-IV/2013-14/35,        Dated: 29-05-2013

BID-DOCUMENT

AMENDMENT                                      CORRIGENDUM

36. 24-08-2013 Construction of 132 KV S/C Transmission line from 132 KV Ambassa S/S to 33 KV Gandacherra S/S/ Sub-head: Demarcation of proposed diversion land (10.536 ha) and CA land by providing RCC pillars.
37. 19-08-2013 Providing of boundary pillars along the periphery of the proposed area of 132KV Sub-Station at Manu alongwith display of signboard
38. 04-09-2013

Augmentation of Sub-Station Capacity by addition of 1x20/25MVA, 132/33KV Transformer along with associated Civil work at Ambassa, Dhalai District, Tripura/ S.H.: Supply Installation with replacement and commissioning of 11KV switchgears and other equipments at Ambassa 132KV Sub-Station, Dhalai District, Tripura.

DNIT No: AGM/TC/ 13-14/ 06 Dates. 12/07/2013

39. 04-09-2013

Augmentation by  addition of 132/33KV , 1x20/25MVA, 132/33KV Transformer along with associated Civil work at 132KV Mission Tilla  Sub-station, Dharmanagar, Tripura /S.H. :  Supply Installation with replacement and commissioning of 11KV switchgears and other equipments at 132KV Mission Tilla Sub-Station, Dharmanagar, North Tripura(W).

DNIT No: AGM/TC/ 13-14/ 04 Dates. 03/07/2013

40. 13-08-2013 Extension of HT /  LT  line and construction of  8 x 100 KVA  Distribution Sub-Station at 8 Nos BOP namely Hiracharra, Maguruli, Latiapura, Murticharra, Halambari, N.C. Para, Rajkandi and Kalatila for Providing provisional service connection  to BOP DG Panels under Electrical Division No - V, Kumarghat.

(D.N.I.T. No. ED – V / KGT / 2013 – 14 / 08 dated 19. 07. 2013

41. 06-09-2013

Design, Manufacture, Testing at works, Supply & Transportation of     Single Phase, 16KVA, Aluminum wound, 11/0.25KV, 50 Hz, Distribution Transformer conforming to IS-1180, IS-2026& other relevant IS with latest amendment.                                  Qty = 100 nos. N.I.T. No:- ESD/17/2013-14

BID DOCUMENT

42. 18-09-2013

Implementation of R-APDRP (Part-B) scheme under Agartala Project ( Phase-II): System strengthening, Improvement and Augmentation of Distribution Network systems including Renovation, Modernization, Re-Conductoring & Bifurcation of existing 11 KV & LT Lines and conversion of bare conductors to UG Cable & AB Cables ……./ Erection of OG installations and Lines ( 11 KV & LT System including DT) by ACSR/AB Cables, 11 KV & 1.1 KV grade Power Cable(UG) including supply of sundry materials and accessories, Hardware, Jointing & termination kits for AB Cable, HT/LT power Cable etc.
NIT No. AGM/EC-II/2013-14/01, Dated 12-08-2013.

BID DOCUMENT

43. 13-09-2013 Design, Manufacture, testing at works, supply / delivery & transportation of 11KV Composite Polymeric Disc Insulator, Ball & Socket type, for 11KV system (E.M.S. – 45KN).

Qty = 25,000 nos.
N.I.T. No:- ESD/19/2013-14

BID DOCUMENT

44. 20-09-2013

Supply, Election, Inspection, Testing & Commissioning of PLCC equipment for Suryamaninagar Sub-station and its associated links.

NIT No.DGM/SOD/2012-13/03 dated 04-03-2013

BID DOCUMENT

45. 11-09-2013 Procurement of Steel Tubular Poles for implementation of R-APDRP (Part-B) Scheme under Kailashahar, Kumarghat & Dharmanagar Project Area (Phase-II).
DNITNO-AGM/EC-III/KGT/R-APDRP / Pt-B/2013-14/01

BID DOCUMENT

46. 11-09-2013 Procurement of ACSR Conductor for implementation of R-APDRP (Part-B) Scheme under Kailashahar, Kumarghat & Dharmanagar Project Area (Phase-II).
DNITNO-AGM/EC-III/KGT/R-APDRP / Pt-B/2013-14/03

BID DOCUMENT

47. 11-09-2013 Procurement of PCC Poles for implementation of R-APDRP (Part-B) Scheme under Kailashahar, Kumarghat & Dharmanagar Project Area (Phase-II).
DNITNO-AGM/EC-III/KGT/R-APDRP / Pt-B/2013-14/05

BID DOCUMENT

48. 12-09-2013 Procurement of Distribution Transformer for implementation of R-APDRP (Part-B) Scheme under Kailashahar, Kumarghat & Dharmanagar Project Area (Phase-II).
DNITNO-AGM/EC-III/KGT/R-APDRP / Pt-B/2013-14/04

BID DOCUMENT

49. 12-09-2013 Procurement of Power Cables (PACKAGE—A6) for implementation of R-APDRP (Part-B) Scheme under Kailashahar, Kumarghat & Dharmanagar Project Area (Phase-II).
DNITNO-AGM/EC-III/KGT/R-APDRP / Pt-B/2013-14/06

BID DOCUMENT

50. 12-09-2013 Procurement of GOS, DOF, LA, Hardware Fittings, GI stranded wire & 8 SWG GI Wire for implementation of R-APDRP (Part-B) Scheme under Kailashahar, Kumarghat & Dharmanagar Project Area (Phase-II).
DNITNO-AGM/EC-III/KGT/R-APDRP / Pt-B/2013-14/02

BID DOCUMENT

51. 09-09-2013 Procurement of Power Cables for implementation of R-APDRP (Part-B) Scheme under Badharghat, Jogendranagar, Pratapgarh, Indranagar & Sonamura Project Area Area.
AGM(DP&C)/R-APDRP/Part-B/EC-II/2013-14/50, Dated: 14-08-2013

BID DOCUMENT


 

Disclaimer: Though all efforts are made to publish accurate information, web masters do not take any responsibility for any inadvertent error. All those concerned are advised to cross check with the official data published from concerned offices of the TSECL to ensure the correctness of the information provided herein.© Tripura State Electricity Corporation Limited. The site is Designed & Developed by www.tripurainfo.com and C&SO, TSECL